Stephen Wright

Planning & Delay Expert

Over 30 years in construction, combining practical project planning with forensic delay analysis and independent expert work.

Stephen Wright
30+Years in the construction industry
20+Appointments providing independent delay-expert advice

INDEPENDENT ADVICE

From project records to expert opinion

With more than 20 appointments providing independent advice as a delay expert, Stephen has provided written and oral evidence in arbitration hearings in Hong Kong, India, Singapore and South Korea, and dispute adjudication board hearings in Thailand, the United Arab Emirates and the United Kingdom.

Contract experience
FIDIC, JCT, NEC and bespoke forms

Geographic experience
Asia, Australia, Europe, the Middle East and the United Kingdom

SECTOR EXPERIENCE

Experience across complex projects

Planning, delay analysis and independent expert work across aviation, buildings, hospitals, energy and infrastructure. Confidential assignments remain unnamed.

Aviation

Retrospective delay analysis

Airport expansion and terminal assignments include Dubai Airport, Dubai Cargo Terminal, Etihad Interim Terminal in Abu Dhabi and Chek Lap Kok Airport in Hong Kong.

Planning and site management

Fit-out planning at Athens and London Luton airports; site management of the Athens Satellite Terminal fit-out.

Infrastructure and interfaces

Kuala Lumpur International Airport assignments covered the 41 km dedicated highway, Satellite Terminal, earthworks, drainage, aircraft movement and express rail interfaces. Earlier work included planning support at Macau International Airport.

Buildings & commercial developments

Major developments

Tender and construction programming for a contractor on the Petronas Twin Towers, and retrospective delay analysis at the O2 Shopping Centre in London.

Expert and claims work

Independent extension of time assessment on a UAE mixed-use development; expert witness work on mixed-use arbitration in Hong Kong; retrospective delay analysis and claim preparation in Hanoi.

Specialist buildings

Assignments include a theme park resort in China, a manufacturing facility in Singapore, a UAE equestrian development, and bank branches, offices and trading centres in Hong Kong and Shanghai.

Hospitals & healthcare

Hospital development | Singapore

Prepared the main contractor’s extension of time claims for a hospital development in Singapore. The project name remains confidential.

Energy & power

Nuclear power

Appointed expert witness for time-related matters in a nuclear power plant arbitration in South Korea. Further experience includes retrospective delay analysis on nuclear power projects in Europe for a major German contractor and in the Middle East for a major Asian contractor.

Conventional generation

Expert appointments and analysis on power projects in Saudi Arabia, Laos and Africa. Planning responsibilities included a 700 MW combined-cycle plant in Thailand and an assignment on a 310 MW peak-load station in Victoria, Australia.

Programme review and dispute support

Contract programme audit on a live open-cycle plant in Oman; retrospective analysis on combined-cycle plants including Qatar; leadership of delay analysts supporting a DAB-appointed expert in South Africa.

Process plants and renewables

Process-plant assignments in Bahrain and Indonesia, retrospective delay analysis on three wind farms in Vietnam, and an independent extension of time assessment on a Vietnam wind farm.

Infrastructure

Rail and roads

Expert appointments on rail projects in Singapore, the United Kingdom and India; leadership of rail claim preparation in Malaysia; retrospective delay analysis on a major Singapore expressway.

Ports and wider infrastructure

Port extension of time claim preparation in Malaysia and an expert appointment on a port project in Thailand. Further assignments include infrastructure claims in Hong Kong and Malaysia, and expert appointments in Thailand.

Team leadership and independent assessment

Led delay analysts assessing joint-venture culpability in the Philippines, and multidisciplinary teams preparing infrastructure extension of time claims in Oman and Thailand. Experience also includes sewage treatment-plant claims in the Middle East.

EXPERIENCE IN PRACTICE

Selected project case studies

Selected assignments showing the project context, Stephen’s role and the work undertaken, while respecting project confidentiality.

ASSIGNMENT AT A GLANCE

  1. Design & procurement
  2. Construction interfaces
  3. Fit-out delivery

Illustrative graphic, not a project image or record.

01 / Aviation | Greece

New Athens International Airport

Coordinating terminal fit-out from planning to site delivery.

Project context
Fit-out works to the Satellite Terminal Building, with planning responsibilities spanning the Main and Satellite Terminals.
Role undertaken
Site management and programme preparation.
Work undertaken
Managed the Satellite Terminal fit-out works and generated design, procurement, construction-interface and coordination programmes at contract and short-term planning levels.
Discuss a similar assignment →

ASSIGNMENT AT A GLANCE

  1. Tender programme
  2. Successful tender
  3. Construction programme

Illustrative graphic, not a project image or record.

02 / Buildings | Malaysia

Petronas Twin Towers

Supporting a contractor from tender planning into construction.

Project context
A contractor’s tender and construction planning for the Kuala Lumpur City Centre development.
Role undertaken
Planning Engineer seconded to a local contractor.
Work undertaken
Prepared the contractor’s tender programme. Following the successful tender, the secondment was extended to include preparation of the contractor’s construction programme.
Discuss a similar assignment →

ASSIGNMENT AT A GLANCE

  1. Project delays
  2. Retrospective analysis
  3. EOT submission

Illustrative graphic, not a project image or record.

03 / Mixed-use development | Vietnam

Retrospective delay analysis

Examining delay on a mixed-use development in dispute.

Project context
An international contractor in dispute on a mixed-use development in Hanoi. The project name is confidential.
Role undertaken
Delay analysis and extension of time submission preparation.
Work undertaken
Analysed the project delays and prepared a retrospective delay analysis and extension of time submission for the contractor.
Discuss a similar assignment →

ASSIGNMENT AT A GLANCE

  1. Time-related matters
  2. Expert appointment
  3. Arbitration

Illustrative graphic, not a project image or record.

04 / Energy & power | South Korea

Nuclear power project arbitration

Independent expert input on a nuclear power dispute.

Project context
Time-related matters in an arbitration concerning a nuclear power plant. The project name is confidential.
Role undertaken
Appointed expert witness on time-related matters.
Work undertaken
Provided expert input on time-related matters within the scope of the arbitration appointment.
Discuss a similar assignment →

ASSIGNMENT AT A GLANCE

  1. Three wind farms
  2. Retrospective analysis
  3. Contractor support

Illustrative graphic, not a project image or record.

05 / Renewable energy | Vietnam

Three wind farm projects

Retrospective delay analysis across three wind farm projects.

Project context
Three separate wind farm projects involving an international contractor. Project names are confidential.
Role undertaken
Retrospective delay analysis.
Work undertaken
Undertook retrospective delay analysis exercises on the three projects for the international contractor.
Discuss a similar assignment →

ASSIGNMENT AT A GLANCE

  1. Infrastructure project
  2. Delay-analysis team
  3. Independent assessment

Illustrative graphic, not a project image or record.

06 / Infrastructure | Philippines

Assessment of joint-venture culpability

Leading an independent assessment of joint-venture culpability.

Project context
An infrastructure project requiring an independent assessment of joint-venture culpability. The project name is confidential.
Role undertaken
Lead of a delay analysis team.
Work undertaken
Led a team of delay analysts preparing an independent assessment of joint-venture culpability.
Discuss a similar assignment →

ASSIGNMENT AT A GLANCE

  1. Hospital development
  2. Main contractor
  3. EOT claim preparation

Illustrative graphic, not a project image or record.

07 / Hospitals & healthcare | Singapore

Hospital development

Preparing extension of time claims for a hospital construction project.

Project context
A hospital development in Singapore. The project name remains confidential.
Role undertaken
Extension-of-time claim preparation for the main contractor.
Work undertaken
Prepared the main contractor’s extension of time claims for the hospital development.
Discuss a similar assignment →

ASSIGNMENT AT A GLANCE

  1. Rail project
  2. Time-related matters
  3. Expert appointment

Illustrative graphic, not a project image or record.

08 / Rail infrastructure | Singapore

Rail project expert appointment

Independent expert input on time-related matters in a rail project.

Project context
A rail project in Singapore. The project name remains confidential.
Role undertaken
Appointed expert witness for time-related matters.
Work undertaken
Provided expert input on the time-related matters within the scope of the rail project appointment.
Discuss a similar assignment →

Credentials, tools and training

Qualification: BTEC Construction Studies.

Training and former memberships: Academy of Experts training sessions; previously held AMAE, ACIOB and ACIArb memberships.

Stephen has experience with Primavera Project Planner, Artemis, MS Project, Powerproject and standalone programme review and risk software.

Stephen has delivered presentations to international contractors and law firms and designed and led workshops on critical path method programming and delay analysis methodologies.

Client feedback on Stephen’s work

“I found Stephen’s advice and opinions to be well researched, presented and independent.”

Legal feedback

“I found Stephen to be highly professional, personable, and driven to achieve results by delivering a very client focused service. Who is responsible, trustworthy, and having a very high level of dedication and integrity.”

Client feedback

Start with your project question

Outline the issue, available records and intended output so we can discuss the appropriate scope.

Request a meeting with Stephen